Drill Intersections

Drill hole
ID
From (m) To (m) Interval
(m)
Gold
(g/t)
Silver
(g/t)
 
SDD-001 No Significant Intercept
 
SDD-002 58.0 70.9 12.9 3.80 38.68
SDD-002 92.1 95.6 3.5 1.69 7.17
 
SDD-003 22.0 45.7 23.7 0.76 42.84
SDD-003 49.9 58.6 8.7 1.17 37.90
 
SDD-004 3.9 12.7 8.8 0.71 28.10
SDD-004 15.8 17.8 2.0 0.71 21.95
SDD-004 26.2 49.9 23.7 1.17 49.64
 
SDD-005 0.8 14.0 13.2 1.07 39.22
SDD-005 20.1 38.2 18.1 2.75 55.71
 
SDD-006 0.0 5.7 5.7 1.74 31.73
 
SDD-007 13.1 25.8 12.7 1.60 28.89
 
SDD-008 0.0 11.5 11.5 4.25 87.80
 
SDD-009 No Significant Intercept
 
SDD-010 No Significant Intercept
 
SDD-011 No Significant Intercept
 
SDD-012 45.5 49.9 4.4 0.78 8.76
SDD-012 62.4 73.4 11.0 0.98 10.22
 
SDD-013 Results Pending
 
SDD-014 78.4 82.2 3.8 1.62 16.97
SDD-014 84.2 86.2 2.0 1.01 6.30

The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular. Drill intersections are calculated using a top-cut of 20 g/t gold, a 0.3 g/t gold trigger, a minimum 0.7 g/t gold composite, and a maximum of 1.5 metres consecutive waste.

Subscribe to our Email List