Drill Intersections

Drill hole
ID
From (m) To (m) Interval
(m)
Gold (g/t)
Uncut
Gold (g/t)
Top cut*
Silver
(g/t)
 
SDD-001 No Significant Intercept
 
SDD-002 58.0 70.9 12.9 3.80 - 38.68
SDD-002 92.1 95.6 3.5 1.69 - 7.17
 
SDD-003 22.0 45.7 23.7 0.76 - 42.84
SDD-003 49.9 58.6 8.7 1.17 - 37.90
 
SDD-004 3.9 12.7 8.8 0.71 - 28.10
SDD-004 15.8 17.8 2.0 0.71 - 21.95
SDD-004 26.2 49.9 23.7 1.17 - 49.64
 
SDD-005 0.8 14.0 13.2 1.07 - 39.22
SDD-005 20.1 38.2 18.1 2.75 - 55.71
 
SDD-006 0.0 5.7 5.7 1.74 - 31.73
 
SDD-007 13.1 25.8 12.7 1.60 - 28.89
 
SDD-008 0.0 11.5 11.5 4.25 - 87.80
 
SDD-009 No Significant Intercept
 
SDD-010 No Significant Intercept
 
SDD-011 No Significant Intercept
 
SDD-012 45.5 49.9 4.4 0.78 - 8.76
SDD-012 62.4 73.4 11.0 0.98 - 10.22
 
SDD-013 Results Pending
 
SDD-014 78.4 82.2 3.8 1.62 - 16.97
SDD-014 84.2 86.2 2.0 1.01 - 6.30
 
SDD-015 No Significant Intercept
 
SDD-016 42.3 46.7 4.4 0.77 - 17.9
SDD-016 68.1 71.3 3.2 0.74 - 17.3
 
SDD-017a Re-drill Results Pending
 
SDD-018 34.7 38.7 4.0 1.58 - 67.60
SDD-018 40.7 46.8 6.1 2.17 - 92.52
SDD-018 64.4 69.1 4.7 1.20 - 34.8
 
SDD-019 12.1 37.3 25.2 6.40 5.45 57.8
including 23.3 36.3 13.0 11.22 9.38 70.5
             
SDD020 No Significant Intercept
SDD-021 2.9 24.9 22 1.85   47.74
including 12.8 19.8 7 3.17   86.53
             
SDD-022 24.7 32.8 8.1 1.51   83.59
SDD-022 34.9 40.8 5.9 1.2   30.92
             
SDD-023 1.7 12.2 10.5 0.74   54.54
             
SDD-024 18.6 24.6 6 1.18   4.95
             
SDD-025 1.3 10.6 9.3 0.9   34.9
             
SDD-026 No Significant Intercept
             
SDD-027 1.5 4.9 3.4 1.06   49.54
SDD-027 13.6 22.7 9.1 1.73   67.23
             
SDD-028 No Significant Intercept
             
SDD-029 4.6 13.8 9.2 0.83   24.89
             
SDD-030 No Significant Intercept
             
SDD-031 47.5 56 8.5 1.98   45.47
SDD-031 63 72.2 9.2 2.21   46.95
             
SDD-032 12.2 25.6 13.4 1.18   36.75
including 16.2 22 5.8 2.04   59.17
SDD-032 30.4 41.5 11.1 1.69   33.63
             
SDD-033 46.8 52.4 5.6 1.31   24.66
SDD-033 56.9 66.1 9.2 1.5   44.55
             
SDD-034 No Significant Intercept
             
SDD-035 52.2 61.3 9.1 1.85   39.71
             
SDD-036 15.5 24 8.5 3   22.29
             
SDD-037 No Significant Intercept
             
SDD-038 7.2 10.2 3 0.79   37.07
SDD-038 12.2 16.2 4 0.73   40.5
             
SDD-039 3.9 7.2 3.3 0.79   19.67
SDD-039 13.3 20.6 7.3 2.68   18.92
             
SDD-039A 53 58.5 5.5 0.72   43.49
             
SDD-040 5.7 12 6.3 0.7   62.89
             
SDD-041 No Significant Intercept
             
SDD-042 No Significant Intercept
             
SDD-043 No Significant Intercept
             
SDD-044 2.6 13.6 11 5.79 5.6 79.86
             
SDD-045 4 6.6 2.6 1.91   15.02
             
SDD-046 20.1 44.4 24.3 5.55 3.72 51.76
including 23.3 31 7.7 15.74 9.97 89.08
             
SDD-047 19.5 27 7.5 0.84   45.26
 
SDD-048 12 15.6 3.6 0.83   46.58
SDD-048 21.6 35.4 13.8 1.43   17.34
 
SDD-049 41.3 49.9 8.6 3.77   1004.46
 
SDD-055 No Significant Intercept
 
SDD-056 61.5 64.6 3.1 1.03   14.09
 
SDD-057 No Significant Intercept
 
SDD-058 No Significant Intercept
 
SDD-059 52.7 55.7 3.0 0.75   31.05
SDD-059 64.3 72.3 8.0 0.90   20.42
 
SDD-060 No Significant Intercept
 
SDD-061 No Significant Intercept
 
SDD-062 48.7 74.3 25.6 1.93   54.20
including 49.8 54.8 5.0 4.59   44.70
 
SDD-063 46.7 68.4 21.7 1.41   32.98
 
SDD-064 30.3 35.5 5.2 2.16   284.70
 
SDD-065 No Significant Intercept
 
SDD-066 72.7 80.8 8.1 1.01   59.03
 
SDD-067 No Significant Intercept
 
SDD-068 46.6 49.6 3.0 1.82   117.50
SDD-068 52.4 57.3 4.9 1.13   119.60
 
SDD-069 No Significant Intercept
 
SDD-070 No Significant Intercept
 
SDD-071 10.0 24.2 14.2 0.72   43.74
SDD-071 44.6 53.2 8.6 1.36   75.03
 
SDD-072 22.0 30.9 8.9 0.97   29.23
 
SDD-073 1.5 46.9 45.4 1.31   44.25
including 24.2 31.9 7.7 2.73   68.43
including 36.9 45.8 8.9 2.56   104.17
 
SDD-074 2.3 29.5 27.2 3.24 3.17 110.41
including 20.6 25.3 4.7 10.16 9.75 416.10
 
SDD-075 5.9 18.2 12.3 1.11   42.85
 
SDD-076 1.5 20.3 18.8 2.14   47.82
including 1.5 6.3 4.8 3.94   60.91
 
SDD-077 3.7 7.6 3.9 1.98   157.23
SDD-077 27.4 30.7 3.3 1.88   29.63
 
SDD-078 4.7 12.1 7.4 2.20   164.75
SDD-078 15.0 30.9 15.9 1.92   23.51
including 15.0 20.7 5.7 3.83   29.27

*A top cut of 20g/t was applied to a drill intersection.

The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular. Drill intersections are calculated using a top-cut of 20 g/t gold, a 0.3 g/t gold trigger, a minimum 0.7 g/t gold composite, and a maximum of 1.5 metres consecutive waste.

Subscribe to our Email List