Drill Intersections

Drill hole ID From (m) To (m) Interval (m) Gold (g/t)
ODD-001 22.1 65.5 43.4 3.89
including 39.6 59.5 19.9 7.87
ODD-001 77.1 104.6 27.5 1.24
including 87.1 99.6 12.5 2.40
 
ODD-002 0.8 15.5 14.7 0.52
ODD-002 89.5 92.5 3.0 2.03
ODD-002 162.8 167.7 4.9 1.49
including 183.7 186.7 3.0 1.78
ODD-002 193.7 197.7 4.0 0.74
 
ODD-003 102.0 104.0 2.0 4.74
 
ODD-004 59.0 61.0 2.0 0.63
ODD-004 87.0 94.2 7.2 0.71
 
ODD-005 92.3 99.3 7.0 0.94
ODD-005 104.3 107.3 3.0 3.47
ODD-005 114.3 125.3 11.0 0.53
 
ODD-006 0.1 9.8 9.7 1.04
ODD-006 62 91.1 29.1 2.46
including 62 67.9 5.9 6.95
 
ODD-007 No significant intercepts
 
ODD-008 106.3 115.6 9.3 2.82
including 112.7 114.7 2.0 12.43
ODD-008 141.5 159.5 18.0 1.04
 
ODD-009 117.2 120.2 3.0 1.60
 
ODD-010 154.1 157.4 3.3 0.54

The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined.  Based on geological interpretation, true width in drill hole ODD-001 is estimated to be approximately 80% of drilled intersection.  Drill holes are designed to intersect mineralization perpendicular or close to perpendicular.

Subscribe to our Email List