Drill Intersections

Drill hole ID From (m) To (m) Interval (m) Gold (g/t) Un-cut
         
ODD-001 34.6 65.5 30.9 5.35
including 39.6 56.5 16.9 8.88
ODD-001 77.1 99.6 22.5 1.43
         
ODD-002 0.8 15.5 14.7 0.52
ODD-002 89.5 92.5 3.0 2.03
ODD-002 162.8 167.7 4.9 1.49
         
ODD-003 102.0 104.0 2.0 4.74
         
ODD-004 87.0 93.2 6.2 0.56
         
ODD-005 35.9 39.1 3.2 0.60
ODD-005 92.3 99.3 7.0 0.94
ODD-005 123.3 127.3 4.0 0.77
         
ODD-006 0.1 9.8 9.7 1.04
ODD-006 62.0 91.1 29.1 2.46
         
ODD-007 No significant intercepts
         
ODD-008 112.7 115.6 2.9 8.64
ODD-008 141.5 154.6 13.1 1.35
         
ODD-009 117.2 120.2 3.0 1.60
         
ODD-010 154.1 157.4 3.3 0.54
         
ODD-014 1.8 5.8 4.0 0.55
         
ODD-015 58.2 66.8 8.6 2.28
ODD-015 97.2 104.1 6.9 0.56
         
ODD-016 3.6 6.6 3.0 0.80
ODD-016 15.2 18.0 2.8 0.73
ODD-016 107.7 114.7 7.0 1.10
ODD-016 131.7 135.8 4.1 1.83
         
ODD-017 84.3 88.3 4.0 2.13
         
ODD-018 26.8 32.8 6.0 0.62
         
ODD-019 13.0 18.0 5.0 0.67
ODD-019 67.0 71.0 4.0 0.50
         
ODD-020 49.6 52.6 3.0 0.68
         
ODD-021 No significant intercepts
         
ODD-022 31.2 34.4 3.2 0.58
ODD-022 72.5 76.1 3.6 2.23
ODD-022 85.0 95.2 10.2 2.55
ODD-022 122.1 124.1 2.0 0.89
         
ODD-023 No significant intercepts
         
ODD-024 Results Pending

The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined.  Based on geological interpretation, true width in drill hole ODD-001 is estimated to be approximately 80% of drilled intersection.  Drill holes are designed to intersect mineralization perpendicular or close to perpendicular.

Subscribe to our Email List