Drill intersections are calculated using a 0.2 g/t gold trigger, a minimum 0.5 g/t gold composite, and a maximum of 3 metres consecutive waste.
Drill holes are designed to intersect mineralization perpendicular or close to perpendicular. Some but not all of the drill holes have been included in mineral resources.