Drill intersections are calculated using a 0.2 g/t gold trigger, a minimum 0.5 g/t gold composite, and a maximum of 3 metres consecutive waste.
The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular.
Drill intersections are calculated using a 0.2 g/t gold trigger, a minimum 0.5 g/t gold composite, and a maximum of 3 metres consecutive waste.
The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined. Drill holes are designed to intersect mineralization perpendicular or close to perpendicular.
Drill Intersections
Drill Hole From
(m)To
(m)Interval
(m)Gold
(g/t)NDD-001 No significant intercepts NDD-002 No significant intercepts NDD-003 1.3 18.5 17.2 0.65 NDD-004 6.7 20.0 13.3 0.55 NDD-005 14.7 23.2 8.5 0.60 NDD-006 25.4 29.7 4.3 0.53 NDD-007 27.5 29.5 2.0 0.57 NDD-008 No significant intercepts NDD-009 No significant intercepts MDD-001 14.5 24 9.5 0.51 MDD-003 0.2 32.4 32.2 0.57 MDD-004 1.9 32.7 30.8 0.76 MDD-005 5.7 29.2 23.5 0.70 MDD-006 2.5 12.2 9.7 0.53 MDD-007 1.5 14.8 13.3 0.58 MDD-008 1 27 26 0.72 Drill Hole From
(m)To
(m)Interval
(m)Gold
(g/t)MRC-001 0 26 26 0.54 MRC-002 19 25 6 0.51 MRC-003 26 28 2 0.58 MRC-004 23 66 43 0.58 MRC-005 No significant intercepts MRC-006 No significant intercepts MRC-007 No significant intercepts MRC-008 18 22 4 0.52 MRC-009 4 20 16 0.99 MRC-010 2 19 17 0.62 MRC-011 1 9 8 0.75 MRC-012 21 55 34 0.94 MRC-013 13 15 2 0.68 MRC-013 22 49 27 0.60 MRC-014 11 17 6 0.61