Drill Intersections

Drill hole ID From (m) To (m) Interval (m) Gold (g/t)
         
ODD-001 22.1 65.5 43.4 3.89
including 39.6 59.5 19.9 7.87
ODD-001 77.1 104.6 27.5 1.24
including 87.1 99.6 12.5 2.40
ODD-001 110.6 112.6 2.0 1.12
ODD-001 121.6 123.6 2.0 1.12
         
ODD-002 0.8 15.5 14.7 0.52
ODD-002 89.5 92.5 3.0 2.03
ODD-002 128.8 130.8 2.0 0.60
ODD-002 162.8 167.7 4.9 1.49
ODD-002 172.7 186.7 14.0 0.54
including 183.7 186.7 3.0 1.78
ODD-002 193.7 197.7 4.0 0.74
         
ODD-003 102.0 104.0 2.0 4.74
         
ODD-004 59.0 61.0 2.0 0.63
ODD-004 87.0 94.2 7.2 0.71

The drill intersections disclosed here have not yet been included in a resource model and true thickness of mineralization has not yet been determined.  Based on geological interpretation, true width in drill hole ODD-001 is estimated to be approximately 80% of drilled intersection.  Drill holes are designed to intersect mineralization perpendicular or close to perpendicular.

Subscribe to our Email List